Mould & Damp Remediation — Remediation Report Template

Mould & Damp Remediation Report

CCMTec Academy  |  Professional Certificate Resource  |  Version 1.0 — August 2026

Section 1 — Executive Summary
Section 2 — Site Assessment Findings
Room / Area Mould Location Substrate Moisture Reading (WME%) RH%
Section 3 — Remediation Works Carried Out
Area Treated Treatment Method Chemical(s) Used & Dilution Dwell Time Operative
 
Section 4 — Post-Remediation Verification
Area Visual Result Post-Treatment Moisture (WME%) Post-Treatment RH% Pass / Fail
Section 5 — Recommendations & Aftercare Advice
Section 6 — Photographic Evidence
This report has been prepared based on a visual inspection and moisture readings taken at the time of survey. It does not constitute a structural survey, a specialist damp survey, or a guarantee against future mould recurrence. The findings and recommendations are based on conditions observed on the date(s) stated. CCMTec Academy course materials are provided for professional development purposes and do not constitute legal or regulatory advice.

Use your browser’s Print function and select “Save as PDF”. Set paper size to A4 portrait, margins to minimum.