Mould & Damp Remediation — Site Assessment Checklist
Mould & Damp Remediation — Site Assessment Checklist
CCMTec Academy | Professional Certificate Resource | Version 1.0 — August 2026
Section 1 — External Inspection
- Roof condition — check for missing/damaged tiles, blocked gutters, failed flashingsNotes:
- Gutters and downpipes — check for blockages, leaks, or missing sectionsNotes:
- External walls — check pointing, render, cladding for cracks or defectsNotes:
- DPC (damp proof course) — check height above ground level, bridging by soil or renderNotes:
- Air bricks / sub-floor ventilation — check for blockagesNotes:
- Window and door frames — check seals, sills, and drainageNotes:
- Ground drainage — check for pooling water adjacent to buildingNotes:
Section 2 — Internal Inspection: Affected Areas
Complete for each affected room / area
- Room / area name and locationRoom:
- Mould growth visible — describe location, colour, and approximate area (m²)Notes:
-
Contamination classification: Minor (<1m²) / Moderate (1–3m²) / Significant (3–10m²) / Severe (>10m²)MinorModerateSignificantSevere
- Moisture meter reading (pin) — record WME % at affected surfaceWME%:
- Moisture meter reading (non-invasive) — map moisture distributionReading:
- Ambient relative humidity (thermo-hygrometer)RH%:
- Ambient temperature°C:
- Surface temperature at mould location (thermal camera / contact thermometer)°C:
- Evidence of cold bridging (thermal imaging or visual)Notes:
- Evidence of penetrating damp (staining, tide marks, salts)Notes:
- Evidence of rising damp (low-level staining, hygroscopic salts, tide mark)Notes:
- Evidence of plumbing leak (check behind panels, under sinks, around WC)Notes:
- Substrate type at mould location (plaster, plasterboard, masonry, timber, other)Type:
- Substrate condition (sound / friable / damaged / requires removal)Condition:
- Photographs taken (Y/N) — record photo reference numbersRefs:
Section 3 — Ventilation & Heating Assessment
- Mechanical ventilation present in kitchen (Y/N) — functioning? (Y/N)Notes:
- Mechanical ventilation present in bathroom(s) (Y/N) — functioning? (Y/N)Notes:
- Trickle vents present on windows (Y/N) — open? (Y/N)Notes:
- Central heating system present and functioning (Y/N)Notes:
- Heating pattern reported by occupant (continuous / timed / intermittent / none)Pattern:
- Tumble dryer vented externally (Y/N / no dryer)Notes:
- Drying laundry indoors reported (Y/N)Notes:
Section 4 — Moisture Source Diagnosis
-
Primary moisture source identifiedCondensationPenetratingRisingPlumbingUnknown
- Secondary moisture source (if applicable)Notes:
- Structural repairs required before remediation can be effective (Y/N)Details:
- Referral to qualified surveyor recommended (Y/N)Reason:
Section 5 — Remediation Scope & PPE Assessment
- Total contamination area (m²)m²:
- Material removal required (Y/N) — specify materialsMaterials:
- Containment required (Y/N) — specify level (basic / full / negative pressure)Level:
-
PPE level requiredFFP2FFP3CoverallGoggles
- Air scrubber / HEPA filtration required (Y/N)Notes:
- Licensed waste contractor required (Y/N)Notes:
- Property to be vacated during treatment (Y/N) — re-entry intervalHours:
- Air or surface sampling recommended (Y/N)Reason:
Section 6 — Additional Notes & Observations
Use this space for any additional observations, access issues, client concerns, or items requiring follow-up.
CCMTec Academy | Mould & Damp Remediation Professional Certificate | Site Assessment Checklist v1.0 — August 2026
This document is provided for professional development purposes. It does not constitute legal or regulatory advice. | www.ccmtec.co.uk
This document is provided for professional development purposes. It does not constitute legal or regulatory advice. | www.ccmtec.co.uk
Use your browser’s Print function and select “Save as PDF”. Set paper size to A4 portrait, margins to minimum.